(1) The purpose of this document is to provide clear instructions on the specific and prescriptive actions to manage risk in accordance with requirements of the Risk Management Policy. (2) Authority for this document is established by the Risk Management Policy. (3) This procedure applies to all (4) Risk domains are enterprise-wide categories that help manage risks impacting RMIT’s objectives. Risk domains are used to scope or frame risk causes that are validated and controlled in an everchanging risk environment. (5) Ownership of risk domains reside with senior executives at the level of Vice-Chancellor's Executive or direct report of the Chief Operating Officer. (6) The addition or retirement of risk domains is informed by changes to the (7) Amendments to risk domain titles or descriptions are approved by the risk domain owner and updated in the enterprise risk system, Riskware. The Vice-Chancellor's Executive and Audit and Risk Management Committee are informed of amendments to risk domain titles or descriptions via the Director of Risk Report. (8) Risk domains are assessed using the Risk Exposure Tool, which is based on the Risk Consequence Rating Tool and the Risk Likelihood Rating Tool. The current risk rating for a specific risk domain is informed by the aggregate of the current risk ratings for the tier 1 risks within that risk domain. (9) All risk domains have a documented Risk Appetite Statement which includes risk posture, risk appetite (limited, balanced or high) risk tolerance statements and metrics for measuring if the risk domain is inside or outside risk appetite. It is the responsibility of the risk domain owner to document the Risk Appetite Statement which is then approved by Council. Enterprise Risk Management will coordinate an annual review of each risk domain’s Risk Appetite Statement. (10) Tier 1 risks are enterprise-wide subcategories of risk domains for which causes, effect and level of control are identified. (11) Key characteristics of each tier 1 risk are that they: (12) Key characteristics of each cause of tier 1 risks are that: (13) Level of control is an indication of control maturity regarding the management of a specific cause. Current state indicates current control maturity in terms of managing a cause, based on assessment by the tier 1 risk owner and risk domain owner. Target state indicates target control maturity (at the time of assessment) in terms of managing a cause, based on assessment by the tier 1 risk owner and risk domain owner. (14) It is the responsibility of tier 1 risk owners (or delegate) to embed level of control monitoring into Business as Usual activities and adjust current and target level of controls, and tier 1 risk ratings, as required in Riskware. Rationale will be documented and attached in Riskware explaining the reason for the movement. (15) A formal review of tier 1 risk ratings, including level of control for each cause, is coordinated by Enterprise Risk Management every 12 months. Any amendments following the review are processed in Riskware by the tier 1 risk owner (or delegate). (16) At the request of the relevant risk domain owner, Enterprise Risk Management can activate automated notifications from Riskware to inform the risk domain owner (and others as required) when a rating for a tier 1 risk in their risk domain has changed. (17) Enterprise Risk Management performs sample checking on a periodic basis to confirm tier 1 risks have been rated accurately and adequate rationale is documented in Riskware to support the rating. (18) The addition or retirement of tier 1 risks is informed by changes to RMIT’s risk profile and is approved by the relevant risk domain owner. Audit and Risk Management Committee, Vice-Chancellor’s Executive and relevant Council sub-committees are informed via the Director Risk Report. (19) Tier 2 risks are specific instances of risk isolated to a portfolio, controlled entity or college. (20) Tier 2 risks are linked to the most relevant tier 1 risk in Riskware to provide the tier 1 risk owner and risk domain owner visibility over areas of specific exposure within operational portfolios, colleges or controlled entities. It is the responsibility of the tier 2 risk owner to confirm with the relevant tier 1 risk owner that the linkage is appropriate. (21) Ownership of tier 2 risks resides at the director level (including Assistant Directors or Associate Directors) or above within the specific college, portfolio or controlled entity that owns the tier 2 risk. (22) The addition or retirement of tier 2 risks will be informed by changes to RMIT’s risk profile. The addition or retirement of tier 2 risks will be approved by the owner of the tier 2 risk profile. (23) Tier 2 risks will be assessed using the Risk Exposure Tool, which is based on the Risk Consequence Rating Tool and the Risk Likelihood Rating Tool. (24) A formal review of tier 2 risk ratings will be coordinated by Enterprise Risk Management every 12 months. Amendments to tier 2 risks will be processed in Riskware by the tier 2 risk owner (or delegate). Rationale for the risk rating will be documented in Riskware. (25) At the request of the relevant risk domain owner or tier 1 risk owner, Enterprise Risk Management can activate automated notifications from Riskware to inform the relevant owner when a current rating for a tier 2 risk linked to their tier 1 risk has changed. (26) Enterprise Risk Management will perform sample checking on a periodic basis to confirm that tier 2 risks have been assessed accurately and adequate rationale is documented in Riskware to support the rating. (27) A control is defined as ‘any action taken by management to manage risk and increase the likelihood that established objectives and goals will be achieved’. A control is not a meeting, a policy or a procedure. There may be certain requirements documented in a policy or a procedure which are a control. (28) Controls should be designed and operated to: (29) Control descriptions within Riskware should include the following characteristics: (30) Detailed below is an example of a control description which includes the above characteristics: (31) Controls can either be preventive or detective: (32) Controls can either be manual or automated: (33) The benefits of identifying whether a control is either preventive or detective; and manual or automated; is that it allows a holistic view of the internal control environment and will guide the level of assurance that may be required over specific controls. (34) Ownership of internal controls should sit at the senior manager level or above. A control owner is a person who is accountable for ensuring a control activity exists, is in place and is operating effectively. The control owner may not necessarily perform the control activity; however if not operating the control they are usually accountable for maintaining a level of oversight over its performance or effectiveness. (35) Ownership of internal controls cannot be delegated to a third party and must be assigned to a single individual. (36) Controls can be assessed as either effective or not effective defined as: (37) Controls can also be ‘not rated’ within Riskware. This may be appropriate when a control has recently been operationalised but it’s effectiveness is not yet known. (38) It is the responsibility of the control owner (or delegate) to assign a control effectiveness rating in Riskware. If there are circumstances which warrant the control to be reassessed this should occur as part of business as usual. These circumstances may include internal or external audit findings, regulatory findings, assurance results, complaints, incidents, losses etc. (39) Risk Owners should review and approve controls that are linked to their risk(s) to ensure they are comfortable that the control is relevant in mitigating the risk. (40) It is the responsibility of risk domain owners to ensure there are appropriate levels of assurance across risk domains they own utilising the assurance plan template provided by Enterprise Risk Management, which details: (41) A treatment plan is defined as formal documentation detailing actions to be taken and responsibilities for implementing controls or processes to reduce the likelihood or impact of risks. Treatment plans may involve enhancements to existing controls which are assessed as ‘not effective’ or the design and implementation of new controls to further mitigate the risk. (42) It is the responsibility of the treatment plan owner (or delegate) to design the treatment plan and document these in Riskware. The following fields in Riskware must be completed: (43) The treatment plan design should be approved by the relevant risk owner(s) to confirm they are comfortable that the treatment plan design mitigates the control gaps identified. (44) A treatment plan is required in the following circumstances: (45) If a treatment plan is not required or cannot be implemented (i.e. no funding or resourcing), risk acceptance processes must be followed, and approval sought from the relevant source to accept the risk. These approval levels are: (46) Evidence of approval of risk acceptance will be provided via email and attached in Riskware by the Risk Owner (or delegate). (47) Any amendments to due dates for a treatment plan are processed in Riskware by the treatment plan owner (or delegate) and following approval from the following sources: (48) Evidence of approval is provided via email and attached to the treatment plan in Riskware by the treatment plan owner (or delegate). (49) At the request of the relevant risk owner, Enterprise Risk Management can activate automated notifications from Riskware to inform the risk owner (or other relevant personnel) when a treatment plan mitigating risks they own have become overdue or are complete. (50) To ensure completed treatment plans have been implemented as designed, and mitigate the control gaps previously identified, the following verification will occur: (51) Evidence confirming the treatment plan has been completed will be attached in Riskware by the treatment plan owner (or delegate), and evidence of the above verification will be attached in Riskware by the risk champion. (52) Enterprise Risk Management will perform sample checking on a periodic basis to confirm that treatment plans linked to low and medium rated risks have been closed in line with the above requirements and mitigate the identified risk. (53) Enterprise Risk Management will report (via the Director Risk Report) to relevant governance committees on the following:Risk Management Procedure
Section 1 - Context
Section 2 - Authority
Section 3 - Scope
Section 4 - Procedure
Risk Domains – Minimum Requirements
Tier 1 Risks – Minimum Requirements
Tier 2 Risks - Minimum Requirements
Control Design and Operation – Minimum Requirements
Treatment Plan – Minimum Requirements
Reporting and Monitoring
View Document
This is the current version of this document. You can provide feedback on this policy document by navigating to the Feedback tab.